ESG | Multi-Site Deployment | 5.6 MW
Delivered a 5.6 MW off-site solar program for 50 fuel stations, generating CAD 1.5M annual savings and 7,300 tCO₂e reduction, scalable to 28 MW.
Led pre-execution development, coordinating stakeholders across client, utility, consultants, and vendors to enable approvals, design finalization, and execution readiness.
5.6 MW pilot capacity delivering CAD 1.5M annual savings
Enabled 50 fuel stations to transition toward 100% renewable electricity
Minimized operational disruption across active fuel stations
Enabled scale-up from 5.6 MW pilot to a ~28 MW program through subsequent tender in the same region
Distributed portfolio of 50 fuel stations within a single LDC, creating multi-site aggregation and coordination complexity
Limited on-site solar feasibility due to space, safety constraints, and operational risks at fuel stations
On-site deployment required station shutdowns for assessment and strengthening, leading to revenue loss and extended approval timelines
Existing off-site solar models required adaptation for fuel retail operations and utility alignment
• Implemented an off-site solar model under Group Net Metering, enabling centralized generation and energy offset across multiple fuel stations
• Developed a portfolio-based approach, aggregating 50 stations under a single solar asset to simplify execution and maximize scale efficiency
• Eliminated on-site risks by avoiding station shutdowns, structural modifications, and safety-related approvals
• Coordinated with utility (LDC) to enable multi-meter energy allocation and billing alignment across distributed assets
• Led stakeholder alignment across PSU, NGO, government, utility, and I&C partners to enable execution under compressed timelines